Winter Break Central Utility Plant Maintenance Scheduled

December 16, 2024

The Central Utility Plant will undergo maintenance over the winter break, beginning on Sunday, Dec. 29, and is expected to resume full operations by Friday, Jan. 3, 2025.

During this time, air conditioning will still be available in the following locations:

  • C Annex
  • Building O
  • Building Q (Little School)
  • R Annex
  • Building T
  • Building U
  • Building Z (Zoo)
  • Press boxes at the ballfields

Air conditioning will be unavailable in all other buildings on the Northwest Campus. Please plan accordingly for this maintenance period.